The maximum lifting capacity of the hoist can vary, namely in function of the position of the hoist on the overhead crane, or in function of the position of the overhead crane on its runway. This makes it possible to select an optimal load, in function of the available runway. Let us assume that the highest lifting capacity of the runway is 4 tonnes, then you can safely lift up to 5 tonnes in the central section of the overhead crane.
Or, also, if you lengthen the existing runway and wish to have a higher lifting capacity in the new area: As you see, the "restricted load areas" smart function offers a solution in many different situations.